35+ Years

Industry Expertise

120,000 m²

Modern Manufacturing Base

8,000+ Cases

Global Safe Deliveries

Your Trusted Partner for Industrial Lifting Solutions

Complete crane solutions for manufacturing, logistics and heavy industry

ANTOP CRANE

2
Gantry Crane
7
Overhead Crane
5
Yacht Crane
9
Port Crane
8
KBK Crane
6
Jib Crane
4
Bridge crane
3
Hoist Crane

0dfd37f5 4fe8 4971 81f8 2d8a62787cd4Share your  capacity, span, and industry needs for a tailor – made design

图片 1 19

We are Antop Crane, Your Trusted Global Partner in Heavy Industry.

Located in Xinxiang, Henan—the “Hometown of Cranes” in China—Antop Crane has been dedicated to providing high-quality lifting solutions to clients worldwide. By combining advanced engineering with strict quality control, we manufacture safe, reliable, and efficient lifting equipment designed to boost your productivity and lower operational costs.

From overhead cranes and gantry cranes to electric hoists, every piece of Antop equipment is meticulously designed and tested. We believe that innovation is not just about building machines; it’s about ensuring worker safety and carrying the weight of your trust. Quality today is the market tomorrow.

25 year experience

With over 25 years of experience in the field of industrial manufacturing, we guarantee the best quality and products.

Safety is top priority

For us, occupational safety is a top priority, with modern machinery and safety facilities. so it’s well worth.

3b13a26a fb67 4177 afac e2a288e5686aDidn’t find your industry solution? Consult our technical experts  immediately.

Frequently Asked Questions

If you have any questions about our cranes or services, please check below or contact us directly. We are ready to help!

Antop Crane is a professional crane manufacturer based in Xinxiang, Henan, China—known as the "Hometown of Cranes". Since established, we have been dedicated to providing high-quality overhead cranes, gantry cranes, and electric hoists to clients worldwide. We are a direct factory, ensuring the best price and quality control.

Yes, absolutely! Customization is our core strength. Every workshop is different. Just share your requirements (Lifting Capacity, Span, Lifting Height, and Power Supply), and our engineer team will provide a tailor-made drawing and quotation for you completely free of charge.

Yes. For most projects, we provide detailed installation manuals and 3D video tutorials to help your local team install it easily. for large or complex projects, we can dispatch our senior engineers to your site to supervise the installation and train your operators.

We offer a 12-month standard warranty for the main machinery and electrical parts after installation. During this period, if any quality problems occur (excluding human error), we will send replacement parts for free via express. We also provide lifetime technical support for all our products.

For standard electric hoists and accessories, the delivery time is usually 10-15 days. For customized overhead or gantry cranes, production typically takes 30-50 days depending on the specifications. We prioritize urgent orders to meet your project schedule.

Get In Touch

Leave your details and requirements. For urgent inquiries, contact us via WhatsApp for a faster response.