35+ Years

Industry Expertise

120,000 m²

Modern Manufacturing Base

8,000+ Cases

Global Safe Deliveries

Antuo recently completed the installation of a 30-ton double-girder bridge crane for a steel processing plant in Surabaya, Indonesia. This crane is designed to handle heavy cylindrical components used in the manufacturing of large-scale industrial machinery.

30 ton double girder overhead crane lifting steel roller in factory

This client specializes in the production of steel rollers and heavy machinery components—parts that require stable and precise lifting equipment during processing and assembly to ensure safe handling. The newly installed overhead crane has significantly enhanced material handling efficiency within the workshop.

The Indonesian client contacted ANTOP, outlining several key requirements regarding their lifting solution:

  • Lifting Heavy Cylindrical Steel Components

  • Ensuring Smooth and Stable Lifting During Precision Machining

  • Covering an Extensive Workshop Area

  • Enhancing Workshop Safety and Workflow Efficiency

Given the extreme length and weight of the steel rollers, the crane is required to provide exceptional load stability and precise positioning during lifting operations.

After analyzing the client’s workshop layout and lifting requirements, Antuo engineers recommended a double-girder overhead crane solution equipped with a high-performance electric hoist and an advanced control system.

The crane features a robust box-girder structural design, ensuring maximum rigidity and durability under heavy loads. The hoisting system facilitates smooth acceleration and deceleration, enabling operators to safely handle large steel components without vibration or swaying.

Furthermore, the crane is equipped with comprehensive safety protection systems—including overload protection, limit switches, and emergency stop functions—to ensure reliable operation during daily industrial use.

Technical Specifications

Parameter Specification
Crane Type Double-Girder Bridge Crane
Lifting Capacity 30 tons
Span 22 meters
12 meters
Working Class A5
Power Supply 380 V / 50 Hz
Control Mode Wireless Remote Control
Lifting Speed 0–6 m/min

The installation work was jointly carried out by ANTOP’s technical team and local engineering personnel. The installation process included:

  • Crane structural assembly

  • Electrical system setup

  • Load testing

  • Operator training

Upon completion of commissioning, the crane successfully passed full-load testing and was put into operation within the production workshop.

The newly installed bridge crane has significantly enhanced material handling efficiency at the steel processing plant. Operators can now lift and transport large steel rolls within the workshop with greater safety, precision, and stability.

The client expressed high satisfaction with the crane’s performance, manufacturing quality, and the professional support provided by the ANTOP engineering team.

This project demonstrates ANTOP’s capability to deliver reliable heavy-duty lifting solutions to industrial clients worldwide.

ANTOP engineers collaborated with the local technical team to complete the installation of a 30-ton double-girder bridge crane. The steel structure, electrical systems, and hoisting mechanisms were assembled step-by-step in accordance with the workshop layout plan.

Following installation, the crane underwent testing under various load conditions to ensure stable and safe performance. The testing process included hoisting tests, travel tests, and braking tests.

This 30-ton double-girder bridge crane is equipped with advanced safety protection systems, including overload protection, limit switches, and emergency stop functions.

The crane has significantly improved material handling efficiency while ensuring safe operations within a heavy manufacturing environment.