In June 2024, ANTOP’ combined equipment launched at a Kazakhstani building material factory. It solved stable transfer of 4.5-ton/6m steel bars/pipes in dry/dusty -20℃ winter conditions, compatible with 12m rails. Core Solutions Sealed gearbox + dust filter; quenched alloy steel hook…
In September 2024, ANTOP’ combined equipment was put into use at a Thai canned food factory. It addressed rapid, hygienic transfer of 1.2-ton metal materials in 30-35℃/60-85% humidity, fitting 6m narrow workshops and HACCP standards. Core Solutions IP65 waterproof hoist…
Project Details Project Name: ANTOP CRANE 120-Ton Gantry Crane Experimental Operation Project at Port Klang, Malaysia Partner: Port Klang Authority, Malaysia Equipment Model: MGH120t-40m Double-Main Girder Gantry Crane Test Period: March 2025 – September 2025 Core Objectives: Verify the stability, efficiency and safety of the equipment in tropical port environments,…