Industry Expertise
Modern Manufacturing Base
Global Safe Deliveries
2–4 Hoists on One Beam • Work Faster • Save 50% Cost vs. Multiple Cranes
|
Need
|
Our Solution
|
|---|---|
|
“Workers wait for one hoist to finish”
|
→ 2–4 chain hoists on one beam – lift multiple items at same time
|
|
“Need 2 cranes but no budget/space”
|
→ One crane does 2–4 jobs. Saves 50% cost vs. buying separate cranes
|
|
“Long beam needs balanced lifting”
|
→ Run hoists together – lift long items safely (e.g., pipes, steel beams)
|
|
Parameter
|
Range/Details
|
|---|---|
|
Rated Lifting Capacity
|
2+2T – 15+15T
|
|
Span Length
|
7.5m – 31.5m
|
|
Lifting Height
|
3m – 12m
|
|
Working Class
|
A3 – A4
|
|
Lifting Speed
|
Single speed: 3m/min – 8m/min; Dual speed optional (0.8m/min -8m/min)
|
|
Trolley Traveling Speed11-21
|
11/21m/min
|
|
Crane Traveling Speed
|
30m/min
|
|
Control Mode
|
Ground pendant control/Remote control
|
|
Power Supply
|
380V/50Hz/3Phase /Customizable
|
|
Girder Material
|
Q235B High-Strength Structural Steel
|
|
Working Temperature
|
-20℃ – +45℃
|
|
Protection Grade
|
IP44 (Standard); IP65 optional for dusty/humid environments
|
Not sure which product fits your needs?
Submit the form below and our engineers will design a customized solution for you at no extra cost.