Industry Expertise
Modern Manufacturing Base
Global Safe Deliveries
|
Need
|
MHL Solution
|
|---|---|
|
“Workers wait for one hoist to finish”
|
→ Two hoists work independently – lift two items at once. Double your speed
|
|
“Need to lift long beams/pipes”
|
→ Run both hoists together – share load safely, no tilt or bending
|
|
“Don’t want two separate gantry cranes”
|
→ One crane does both jobs. Saves 40% cost vs. buying two cranes
|
|
Parameter
|
Range/Details
|
|---|---|
|
Rated Lifting Capacity
|
1T – 20T
|
|
Span Length
|
16m – 30m
|
|
Lifting Height
|
6m – 12m
|
|
Working Class
|
A4
|
|
Lifting Speed
|
Single speed: 7m/min – 8m/min; Dual speed optional (0.8m/min -8m/min)
|
|
Trolley Traveling Speed
|
20m/min
|
|
Crane Traveling Speed
|
20m-40m/min
|
|
Control Mode
|
Cab Control/Remote control
|
|
Power Supply
|
380V/50Hz/3Phase /Customizable
|
|
Girder Material
|
Q235B High-Strength Structural Steel
|
|
Working Temperature
|
-20℃ – +45℃
|
|
Protection Grade
|
IP44 (Standard); IP65 optional for dusty/humid environments
|
Not sure which product fits your needs?
Submit the form below and our engineers will design a customized solution for you at no extra cost.